All Issue

2020 Vol.10, Issue 3 Preview Page

Research Article

December 2020. pp. 45-69
Abstract
References
1
Ahuja, N., Dozzi, P., and Abourizk. M. (1994). Project Management: Techniques in planning and controlling construction projects. 2nd ed. John Wiley & Sons, Inc.
2
Akinci, B., Fischer, M., Levitt, R., and Carlson, R. (2002). Formalization and automation of time-space conflict analysis. Journal of Construction Engineering Management 16(2): 124-34. 10.1061/(ASCE)0887-3801(2002)16:2(124)
3
Arditi, D. (1983). Diffusion of network planning in construction. Journal of Construction Engineering Management, Vol. 109(1), pp.1-12. 10.1061/(ASCE)0733-9364(1983)109:1(1)
4
Arditi, D. and Rackas, A. (1986). Software needs for construction planning and scheduling. International Journal of Project Management 4(2): 91-96. 10.1016/0263-7863(86)90035-9
5
Atack, J., Bateman, F., and Margo, R. (2003). Productivity in manufacturing and the length of the working day: evidence from the 1880 census of manufactures. Explorations in Economic History 40 (2) 170-194 Publisher: Elsevier. 10.1016/S0014-4983(03)00016-0
6
Atkins, D. (1988). Animation/simulation for construction planning, Engineering, Construction, and Operations in Space: Proceedings of Space 88, Albuquerque, ASCE, 670-678.
7
Bailey, S., and Ian, F. (1994) Case-based preliminary building design. Journal of Computing in Civil Engineering, ASCE, 8 (4) 454-468. 10.1061/(ASCE)0887-3801(1994)8:4(454)
8
Ballard, G., and Howell, G. (2003). An update on last planner: Proceedings of 11th Annual Conference, International Group for Lean Construction. Blacksburg, Virginia, U.S.A.
9
Benjamin, O., et al. (1990). Knowledge-based prototype for improving scheduling productivity. Journal of Computing In Civil Engineering, ASCE, Vol.4 (2), pp.124-133. 10.1061/(ASCE)0887-3801(1990)4:2(124)
10
Caroni, G., et al. (1984). An approach to planning and control of advanced projects. International Journal of Project Management 2(3): 168-174.
11
Chan, W., Chua, D., and Kannan, G. (1996). Construction resource scheduling with genetic algorithms. Journal of Construction Engineering and Management 122 (2) 125-132. 10.1061/(ASCE)0733-9364(1996)122:2(125)
12
Chau, K., Anson, M., and Zhang, J. (2003). Implementation of visualization as planning and scheduling tool in construction. Building and Environment Vol. 38, pp. 713-719. 10.1016/S0360-1323(02)00239-1
13
Chen, D. and Odobez, J. (2005). Video text recognition using sequential Monte Carlo and error voting methods. Pattern Recognition Letters 26(9): 1386-1403. 10.1016/j.patrec.2004.11.019
14
Chen, Y., et al. (2010). Sustainable performance criteria for construction method selection in concrete buildings. Automation in Construction 19(2): 235-244. 10.1016/j.autcon.2009.10.004
15
Chen, X., et al. (2012). A flexible assembly retrieval approach for model reuse. Computer-Aided Design 44(6): 554-574. 10.1016/j.cad.2012.02.001
16
Cleveland Jr., A. (1989). Real-time animation of construction activities. Proceedings of Construction Congress I-Excellence in the Constructed Project, ASCE, New York, pp. 238-243.
17
Cooke, B. (1992). Contract Planning and Contractual Procedures. 3rd Edition. London: Macmillan. 10.1007/978-1-349-12964-5
18
Cruz-Neira, C. (1993), Virtual Reality Overview, SIGGRAPH '93 Course Notes #23. pp. 1 - 18
19
Dermer, J. (1977). Management Planning and Control Systems. Georgetown, Ontario: Irwin-Dorsey.
20
Dikmen, I., et al. (2007). A case-based decision support tool for bid mark-up estimation of international construction projects. Automation in Construction 17(1): 30-44. 10.1016/j.autcon.2007.02.009
21
Dunder, D. (1980). Computer acquisition for the small contractor. Journal of the Construction Division, ASCE Vol. 106, No. C02, June, 1980, pp. 173-184. 10.1061/JCCEAZ.0000875
22
Dzeng, J., and Tommelein, I. (2004). Product modeling to support case-based construction planning and scheduling. Automation in Construction 13(3): 341-360. 10.1016/j.autcon.2003.10.002
23
Faniran, O., Oluwoye, J., and Lenard, D. (1994). Effective Construction Planning. Construction Management and Economic, Vol. 12(6), pp. 485-499. 10.1080/01446199400000060
24
Fischer, M., and Aalami, F. (1996). Scheduling with computer-interpretable construction method models. Journal of Construction Engineering and Management 122 (4) 337-347. 10.1061/(ASCE)0733-9364(1996)122:4(337)
25
Froese, T. (2005). Impact of Emerging Information Technology on Information Management. International Conference on Computing in Civil Engineering, ASCE, Cancun, Mexico, Paper #8890, 10 pages., Electronic book (published on CD), July 12-15. 10.1061/40794(179)162
26
Gavish, B., and Pirkul, H. (1991). Algorithms for multi-resource generalized assignment problem. Management Science, Vol. 37 (6): INFORMS, Providence, R.I., USA, pp. 695-713. 10.1287/mnsc.37.6.695
27
Gowda, S., Jayaram, S., and Jayaram, U. (1999). Architectures for Internet-based Collaborative Virtual Prototyping. Proceedings of the 1999 ASME Design Technical Conference and Computers in Engineering Conference, DETC99/CIE-9040, Las Vegas, Nevada, September 11-15.
28
Gray, C. (1986). Intelligent Construction Time and Cost Analysis. Construction Management and Economics, Vol. 4(2), pp. 135-150. 10.1080/01446198600000011
29
Guo, S. (2002). Identification and resolution of work space conflicts in building construction. Journal of Construction Engineering Management; 128(4): 287-95. 10.1061/(ASCE)0733-9364(2002)128:4(287)
30
Harris. F., McCaffer. R. (1995). Modern Construction Management, Granada Publishing, pp. 10-43.
31
Harrison, F.L. (1981), Advanced Project Management. New York: John Wiley and Sons.
32
Hegazy, T. (1999). Optimization of resource allocation and levelling using genetic algorithms. Journal of Construction Engineering and Management 125 (3) 167-175. 10.1061/(ASCE)0733-9364(1999)125:3(167)
33
Hegazy, T., and Kassab, M. (2003). Resource optimization using combined simulation and genetic algorithms. Journal of Construction Engineering and Management 129 (6) 698-705. 10.1061/(ASCE)0733-9364(2003)129:6(698)
34
Illingworth, J. (1993). Construction Methods and Planning. London: E&FN Spon.
35
Ioannou, P., and Martinez, J. (1996). Animation of complex construction simulation models. Proceedings of the 3rd congress on computing in civil engineering. Reston (VA): ASCE; pp. 620-6.
36
Isaac, S. and Navon, R. (2009). Modeling building projects as a basis for change control. Automation in Construction 18(5): 656-664. 10.1016/j.autcon.2009.01.001
37
Kahan, E., and Madrid, X. (1987). Integrated system to support plant operations. Hydrocarbon Processing Symposium 55-60.
38
Kahkonen, K. (1993). Modelling Activity Dependencies for Building Construction Project Scheduling, Espoo, Technical Research Centre of Finland, VTT Publications, pp.153.
39
Kamat, R., and Martinez, J. (2008). Software mechanisms for extensible and scalable 3D visualization of construction operations. Advances in Engineering Software 39(8): 659-675. 10.1016/j.advengsoft.2007.07.001
40
Karshenas, S., Haber, D. (1990). Economic Optimisation of Construction Project Scheduling. Construction Management and Economics, Vol.8 (2), pp. 13 5-146. 10.1080/01446199000000012
41
Kartam, A., Levitt, E., and Wilkin, E. (1991). Extending Artificial Techniques for Hierarchical Planning. Journal of Computing in Civil Engineering, ASCE, Vol. 5(4), pp. 464-477. 10.1061/(ASCE)0887-3801(1991)5:4(464)
42
Ketler, K. (1993). Case-based reasoning: An introduction. Expert Systems with Applications 6(1): 3-8. 10.1016/0957-4174(93)90014-W
43
Kiviniemi, A. (2005). Requirements Management Interface to Building Product Models. PhD Thesis, Department of Civil and Environmental Engineering, Stanford University.
44
Kohler, N., and Lutzkendorf, T. (2002). Integrated life-cycle analysis. Building Research and Information 30 (5) 338-348. 10.1080/09613210110117584
45
Kolodner, J. (1993). Case-Based Reasoning. San Mateo, CA: Morgan Kaufmann. 10.1016/B978-1-55860-237-3.50005-4
46
Koo, B., and Fischer, M. (2000). Feasibility study of 4D CAD in commercial construction. Journal of Construction Engineering and Management 126 (4) 251-260. 10.1061/(ASCE)0733-9364(2000)126:4(251)
47
Laufer, A., and Tucker, L. (1988). Competence and Timing Dilemma in Construction Planning. Construction Management and Economics, Vol. 6(4), pp. 339-355. 10.1080/01446198800000027
48
Laufer, A. (1999). Essentials of project planning: owners' perspective. Journal of Management in Engineering, Vol. 2, pp. 162-176. 10.1061/(ASCE)9742-597X(1990)6:2(162)
49
Lee-Kelley, L., and Turner, N. (2016). PMO Managers' self-determined participation in a purposeful virtual community-of-practice. International Journal of Project Management 35 (2017) 64-77. 10.1016/j.ijproman.2016.09.014
50
Leu, S., and Yang, C. (1999). GA-based multi-criteria optimal model for construction scheduling. Journal of Construction Engineering and Management 125 (6) 420-427. 10.1061/(ASCE)0733-9364(1999)125:6(420)
51
Li, H., and Love, P. (1997). Using improved genetic algorithms to facilitate time-cost optimization. Journal of Construction Engineering and Management 123 (3) 233-237. 10.1061/(ASCE)0733-9364(1997)123:3(233)
52
Li, H., et al. (2008). Integrating design and construction through virtual prototyping. Automation in Construction 17(8): 915-922. 10.1016/j.autcon.2008.02.016
53
Li, H., et al. (2012). Virtual prototyping for planning bridge construction. Automation in Construction 27(0): 1-10. 10.1016/j.autcon.2012.04.009
54
Lichtenberg, S. (1981). Real World Uncertainties in Project Budgets and Schedules. Proceedings of PMI INTERMET Joint Symposium, Boston MA, pp.179-193.
55
Maher, M., and Garza, A. (1996). Design case adaptation using genetic algorithms. Proceedings of the 8th International Conference on Computing in Civil and Building Engineering., ASCE, Anaheim, CA, pp. 294-300.
56
Martinez, J. (1998). Earthmover - simulation tool for earthwork planning. Proceedings of the 1998 winter simulation conference. San Diego (CA): Society for Computer Simulation; 1998. p. 1263-71.
57
Mason, D. (1984), The CPM Techniques in Construction: A Critique. Transaction of The American Association of Cost Engineers (Montreal), pp. E.2. 1. -E.2. 10.
58
McKinney, K. and M. Fischer (1998). Generating, evaluating and visualizing construction schedules with CAD tools. Automation in Construction 7(6): 433-447. 10.1016/S0926-5805(98)00053-3
59
Ng, S., and Smith, N. (1998). Verification and validation of case-based prequalification system. A.S.C.E. Journal of Computing in Civil Engineering 12 (4) 215-226. 10.1061/(ASCE)0887-3801(1998)12:4(215)
60
Ofori, G. (1994). Practice of construction industry development at the crossroads. Habitat International 18(2): 41-56. 10.1016/0197-3975(94)90049-3
61
Popov, V., et al. (2010). The use of a virtual building design and construction model for developing an effective project concept in 5D environment. Automation in Construction 19(3): 357-367. 10.1016/j.autcon.2009.12.005
62
Retik, A. and Shapira, A. (1999). VR-based planning of construction site activities. Automation in Construction 8(6): 671-680. 10.1016/S0926-5805(98)00113-7
63
Riesbeck, C., and Schank, R. (1989). Inside case-based reasoning. Hillsdale, NJ: Lawrence Erlbaum.
64
Riley, D., and Sanvido, V. (1995). Patterns of construction-space in multi-storey buildings. Journal of Construction Engineering Management; 121(4): 464-73. 10.1061/(ASCE)0733-9364(1995)121:4(464)
65
Riley, D., and Sanvido, V. (1997). Space planning method for multi-storey building construction. Journal of Construction Engineering Management; 123(2): 171-80. 10.1061/(ASCE)0733-9364(1997)123:2(171)
66
Seppanen, O., and Kenley, R. (2005). Performance measurement using location-based status data. Proc. IGLC-13, Sydney, Australia, pp. 263-269.
67
Sherman, R., and Craig, B. (2003). Virtual Reality. Encyclopedia of Information Systems. B. Editor-in-Chief: Hossein. New York, Elsevier: 589-617. 10.1016/B0-12-227240-4/00194-512636967
68
Song, P., Krovi, V., Kumar, V., and Mahoney, R. (1999). Design and Virtual Prototyping of Human-worn Manipulation Devices. Proceedings of the 1999 ASME Design Technical Conference and Computers in Engineering Conference, DETC99/CIE-9029, Las Vegas, Nevada, September 11-15.
69
Sriprasert, E., and Dawood, N. (2003). Multi-constraint information management and visualisation for collaborative planning and control in construction. Information Technology in Construction, 8, pp. 341-366, (Special (e-Work and e-Business).
70
Staub, S., and Fischer, M. (1998). Constructability reasoning based on a 4D facility model. Proceedings of the Structural Engineering World Congress (Structural Engineering World Wide). Elsevier Science Ltd., San Francisco, CA., USA.
71
Stinson, J. (1976). A Branch and Bound Algorithm for a General Class Resource-Constrained Scheduling Problem. PhD Thesis, University of North Carolina at Chapel Hill, Chapel Hill, NC, USA.
72
Talbot, F. (1982). Resource-constrained project scheduling with time-resource trade-offs: the non-pre-emptive case. Management Science, Vol. 28 (10), INFORMS, Providence, R.I., USA, pp. 1197-1210. 10.1287/mnsc.28.10.1197
73
Tah, H., et al. (1999). Information modelling for case-based construction planning of highway bridge projects. Advances in Engineering Software 30(7): 495-509. 10.1016/S0965-9978(98)00128-8
74
Terashima, T. and Matsuo, T. (2011). Visual Display of the Environment Load on the Construction Planning Tool. Commerce and Enterprise Computing (CEC), 2011 IEEE 13th Conference. 10.1109/CEC.2011.63
75
Thabet, W., and Beliveau, Y. (1994). HVLS: horizontal and vertical logic scheduler for multi-storey projects. Journal of Construction Engineering Management; 120 (4): 875-92. 10.1061/(ASCE)0733-9364(1994)120:4(875)
76
Thabet, W., and Beliveau, Y. (1994). Modeling work space to schedule repetitive floors in multi-storey buildings. Journal of Construction Engineering and Management 120 (1) 96-116. 10.1061/(ASCE)0733-9364(1994)120:1(96)
77
Vanice, M. (1995). Virtual reality: What potential does it hold for engineering? Current Advances in Mechanical Design and Production VI. E. E. Mohamed, S. W. Professor Abdalla, A. S. Wifi, P. A. S. W. Prof. A2 - Mohamed E. Elarabi and P. A.S. Wifi. Oxford, Pergamon: 333-348. 10.1016/B978-008042140-7/50031-7
78
Waly, A., and Thabet, W. (2002). A virtual construction environment for preconstruction planning. Automation in Construction 12 139-154. 10.1016/S0926-5805(02)00047-X
79
Wang, J., et al. (2004). 4D dynamic management for construction planning and resource utilization. Automation in Construction 13(5): 575-589. 10.1016/j.autcon.2004.04.003
80
Zhang, H. and Li, H. (2004). Simulation-based optimization for dynamic resource allocation. Automation in Construction 13(3): 409-420. 10.1016/j.autcon.2003.12.005
81
Chang, H. C., Dong, L., Liu, F. X., Lu, W. F. (2000). Indexing and retrieval in machining process planning using case-based reasoning. Artificial Intelligence in Engineering. 14: 1-13, 2000. 10.1016/S0954-1810(99)00027-8
82
Jarmulak, J., Kerckhoffs, E. J. H., Veen, P. V. (2001). Case-based reasoning for interpretation of data from non-destructive testing. Engineering Applications of Artificial Intelligence. 14:401-417, 2001. 10.1016/S0952-1976(01)00026-4
83
Guo, T. (2007). Application of CBR in Virtual-environment-based instrument development technology. 2007 IEEE International Conference on Control and Automation, 2007. Retrieved from https://ieeexplore. ieee.org/document/4376825.
84
Leonardo Rocha de Oliveira (1998). Case-based reasoning in virtual reality: A framework for computer-based training. PhD Thesis, TIME research institute, Department of Surveying, University of Salford, UK.
85
Chen, S-M., Griffis, F. H. (Bud)., Chen, P-H., & Chang, L-M. (2012). Simulation and analytical techniques for construction resource planning and scheduling. Automation in Construction, 21, 99-113. Doi: 10.1016/j.autcon. 2011.05.018. 10.1016/j.autcon.2011.05.018
86
Fatemi Ghomi, S. M. and Ashjari, B. (2002). A simulation model for multi-project resource allocation. International Journal of Project Management, 20(2), 127-130. Doi: 10.1016/s0263-7863(00)00038-7. 10.1016/S0263-7863(00)00038-7
Information
  • Publisher :Korea Institute of Construction Engineering and Management
  • Publisher(Ko) :한국건설관리학회
  • Journal Title :Journal of Construction Engineering and Project Management
  • Volume : 10
  • No :3
  • Pages :45-69
  • Received Date :2020. 08. 06
  • Revised Date :2020. 12. 28
  • Accepted Date : 2020. 12. 31
Journal Informaiton Journal of Construction Engineering and Project Management Journal of Construction Engineering and Project Management
  • NRF
  • KOFST
  • KISTI Current Status
  • KISTI Cited-by
  • crosscheck
  • orcid
  • open access
  • ccl
Journal Informaiton Journal Informaiton - close